IJCOPE Journal

UGC Logo DOI / ISO Logo

International Journal of Creative and Open Research in Engineering and Management

A Peer-Reviewed, Open-Access International Journal Supporting Multidisciplinary Research, Digital Publishing Standards, DOI Registration, and Academic Indexing.
Journal Information
ISSN: 3108-1754 (Online)
Crossref DOI: Available
ISO Certification: 9001:2015
Publication Fee: 599/- INR
Compliance: UGC Journal Norms
License: CC BY 4.0
Peer Review: Double Blind
Volume 02, Issue 05

Published on: May 2026

ANALYSIS OF PLANNING-RELATED CAUSES OF DELAY IN CONSTRUCTION INDUSTRY

Aarohi Shah Darshan Shah Jaymin Patel

Jayraj Solanki

Department of Civil Engineering U.V. Patel Collage of Engineering Ganpat University Kherva Mehsana

Article Status

Plagiarism Passed Peer Reviewed Open Access

Available Documents

Abstract

Delays in projects continue to be a major threat in the construction industry, especially in developing countries where inefficiencies in planning abound. This study seeks to identify planning related determinants of construction project delays so as to come out with critical factors that influence project performance. This research adopted a quantitative methodology using a structured questionnaire survey to a number of professionals in the construction industry. A structured questionnaire survey to construction professionals in order to identify the planning-related factors of delays in construction projects so as to come out with critical factors that influence project performance using descriptive statistics and rankings to ascertain the significant factors impacting project performance. A Cochran's sample size formula was used to determine an appropriate sample size for the study.The results show that poor pre-construction planning, poor scheduling techniques, suboptimal resource allocation and poor risk assessment had the highest impact on project delays, while the pre-construction planning had a higher impact than scheduling.The study advocates the use of better planning tools, good coordination of all stakeholders, and better risk management in order to avert delays, providing critical factors impacting project performance to the professionals in the construction industry.

How to Cite this Paper

Shah, A., Shah, D. & Patel, J. (2026). Analysis of Planning-Related Causes of Delay in Construction Industry. International Journal of Creative and Open Research in Engineering and Management, <i>02</i>(05). https://doi.org/10.55041/ijcope.v2i5.044

Shah, Aarohi, et al.. "Analysis of Planning-Related Causes of Delay in Construction Industry." International Journal of Creative and Open Research in Engineering and Management, vol. 02, no. 05, 2026, pp. . doi:https://doi.org/10.55041/ijcope.v2i5.044.

Shah, Aarohi,Darshan Shah, and Jaymin Patel. "Analysis of Planning-Related Causes of Delay in Construction Industry." International Journal of Creative and Open Research in Engineering and Management 02, no. 05 (2026). https://doi.org/https://doi.org/10.55041/ijcope.v2i5.044.

Search & Index

References


  1. Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in the Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://www.sciencedirect.com/journal/international-journal-of-project-management

  2. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010

  3. Chan, D. W. M., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55–63. https://doi.org/10.1016/S0263-7863(96)00039-7

  4. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479–489.https://doi.org/10.1016/J.IJPROMAN.2011.10.004

Ethical Compliance & Review Process

  • All submissions are screened under plagiarism detection.
  • Review follows editorial policy.
  • Authors retain copyright.
  • Peer Review Type: Double-Blind Peer Review
  • Published on: May 04 2026
CCBYNC

This article is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License. You are free to share and adapt this work for non-commercial purposes with proper attribution.

View License
Scroll to Top