DIGITAL TWIN IMPLEMENTATION FOR PROBABILISTIC CONSTRUCTION SCHEDULE RISK ANALYSIS
U Kanade
Article Status
Available Documents
Abstract
Keywords: digital twin implementation; Monte Carlo simulation; PERT distribution; schedule risk analysis; supply-chain resilience; bullwhip effect; hybrid quantum-classical optimization; quantum annealing; ULD configuration; EV battery SoC/SoH; process flowchart
How to Cite this Paper
Kanade, U. (2026). Digital Twin Implementation for Probabilistic Construction Schedule Risk Analysis. International Journal of Creative and Open Research in Engineering and Management, <i>02</i>(8), 1-9. https://doi.org/10.55041/ijcope.v2i8.041
Kanade, U. "Digital Twin Implementation for Probabilistic Construction Schedule Risk Analysis." International Journal of Creative and Open Research in Engineering and Management, vol. 02, no. 8, 2026, pp. 1-9. doi:https://doi.org/10.55041/ijcope.v2i8.041.
Kanade, U. "Digital Twin Implementation for Probabilistic Construction Schedule Risk Analysis." International Journal of Creative and Open Research in Engineering and Management 02, no. 8 (2026): 1-9. https://doi.org/https://doi.org/10.55041/ijcope.v2i8.041.
References
- AbouRizk, S. M., & Halpin, D. W. (1992). Statistical properties of construction duration data. Journal of Construction Engineering and Management, 118(3), 525–544.
- Aheleroff, S., Xu, X., Zhong, R. Y., & Lu, Y. (2021) Digital Twin as a Service (DTaaS) in Industry 4.0. Applied Sciences, 11(6).
- Ahuja, H. N., & Nandakumar, V. (1985). Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), 325–342.
- Akarshan Gulhane, “Internet of Things, Artificial Intelligence, and Quantum Computing: A Convergent Framework for Smart Logistics Ecosystems” International Journal of Engineering Science and Advanced Technology (IJESAT) Vol 24 Issue 12, 2024 pp 297 of 317
- Akarshan Gulhane, “Industry 5.0 and Intelligent Logistics: Transforming Supply Chain Operations through Human-Centric Automation” International Journal of Engineering Science and Advanced Technology (IJESAT) Vol 24 Issue 12, 2024 pp 287 of 296
- Akarshan Gulhane, " advancements in automotive batteries:," a review international engineering journal for research & development, Volume 8 Issue 6 18-57, 2023. https://iejrd.com/index.php/%20/article/view/3141
- Akarshan Gulhane, " The Future of Vehicles: Solar-Powered Battery Electric Hybrid Vehicle Architecture," 2020
https://contest.techbriefs.com/2020/entries/automotive-transportation/10457
- Akarshan Gulhane, " digital twin technology for building resilient and adaptive global supply chains: a review,” International Research Journal of Modernization in Engineering Technology and Science Volume:06/Issue:12, 2024. DOI: https://www.doi.org/10.56726/IRJMETS64992
- Akarshan Gulhane, " Artificial Intelligence Applications In Sustainable Logistics And Green Supply Chain Management: A Bibliometric Review,” International Research Journal Of Modernization In Engineering Technology And Science,” Volume:06/Issue:12, 2024. Doi: Https://www.Doi.Org/10.56726/Irjmets65006
- Akarshan Gulhane, " Artificial Intelligence And Blockchain Integration For Enhancing Supply Chain Transparency, Traceability, And Resilience,” International Research Journal of Modernization in Engineering Technology and Science Volume:06/Issue:12, 2024. DOI: https://www.doi.org/10.56726/IRJMETS65016
Ethical Compliance & Review Process
- •All submissions are screened under plagiarism detection.
- •Review follows editorial policy.
- •Authors retain copyright.
- •Peer Review Type: Double-Blind Peer Review
- •Published on: Aug 07 2026
This article is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License. You are free to share and adapt this work for non-commercial purposes with proper attribution.