FINANCIAL FEASIBILITY, MODELLING AND ASSET MONETISATION IN GOVERNMENT & PUBLIC SECTOR PROJECT DEVELOPMENT: AN EMBEDDED PRACTICE-BASED STUDY AT A BIG FOUR ADVISORY FIRM
Parth Vinod Wagh
Prof. Meer Mazar Ali
Article Status
Available Documents
Abstract
The short answer is that a recognisable capital-budgeting pipeline exists (site and demand assessment, then a financial model, then a Detailed Project Report), but public-sector realities bend it: confidentiality, many layers of sign-off, and tender deadlines. I also found that bid and proposal work made up 36% of my logged entries, almost as much as pre-feasibility and modelling (39%). The two are not rivals. They are stages of one chain: win the mandate, do the analysis, protect the commercial terms. I propose a one-page assumption-traceability sheet that ties feasibility findings to model inputs, and I set out a research agenda on how Indian G&PS practices balance advisory and bid work. The evidence comes from one trainee’s vantage point, one tracker and confidential projects, so the findings describe process and pattern, not financial outcomes.
Keywords: financial feasibility; financial modelling; capital budgeting; public–private partnership; asset monetisation; National Monetisation Pipeline; government advisory; bid management; Big Four; India
How to Cite this Paper
Wagh, P. V. (2026). Financial Feasibility, Modelling and Asset Monetisation in Government & Public Sector Project Development: An Embedded Practice-Based Study at a Big Four Advisory Firm. International Journal of Creative and Open Research in Engineering and Management, <i>02</i>(11), 1-9. https://doi.org/10.55041/ijcope.v2i11.018
Wagh, Parth. "Financial Feasibility, Modelling and Asset Monetisation in Government & Public Sector Project Development: An Embedded Practice-Based Study at a Big Four Advisory Firm." International Journal of Creative and Open Research in Engineering and Management, vol. 02, no. 11, 2026, pp. 1-9. doi:https://doi.org/10.55041/ijcope.v2i11.018.
Wagh, Parth. "Financial Feasibility, Modelling and Asset Monetisation in Government & Public Sector Project Development: An Embedded Practice-Based Study at a Big Four Advisory Firm." International Journal of Creative and Open Research in Engineering and Management 02, no. 11 (2026): 1-9. https://doi.org/https://doi.org/10.55041/ijcope.v2i11.018.
References
Akomea-Frimpong, I. (2020). A holistic review of research studies on financial risk management in public–private partnership projects. Engineering, Construction and Architectural Management.Akomea-Frimpong, I. (2023). Critical managerial measures on financial risks of sustainable public–private partnership projects: A PRISMA review. Journal of Financial Management of Property and Construction.
Almarri, K. (2019). An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management.
Angel One. (2025, June 6). Can India establish its own Big 4 consulting giants? PMO evaluates the potential. https://www.angelone.in/news/can-india-establish-its-own-big-4-consulting-giants-pmo-evaluates-the-potential
Big4Events. (2026, June 30). Big 4 revenue comparison: How much does each firm earn? https://www.big4events.com/blog/big-4-revenue-comparison-firms
Bing, L., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management, 23(1), 25–35.
Chou, J. S., & Pramudawardhani, D. (2015). Cross-country comparisons of key drivers, critical success factors and risk allocation for public–private partnership projects. International Journal of Project Management, 33(5), 1136–1150.
Demirag, I., Khadaroo, I., Stapleton, P., & Stevenson, C. (2011). Risks and the financing of PPP: Perspectives from the financiers. The British Accounting Review, 43(4), 294–310.
Department of Economic Affairs, Ministry of Finance, Government of India. (2026). Viability Gap Funding (VGF) scheme. https://dea.gov.in/schemes-services/viability-gap-funding-scheme
Ethical Compliance & Review Process
- •All submissions are screened under plagiarism detection.
- •Review follows editorial policy.
- •Authors retain copyright.
- •Peer Review Type: Double-Blind Peer Review
- •Published on: Nov 06 2026
This article is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License. You are free to share and adapt this work for non-commercial purposes with proper attribution.