Published on: June 2026
IDENTIFICATION, ASSESSMENT AND MANAGEMENT OF CRITICAL RISKS IN HYDROELECTRIC PROJECTS
Birendra Kumar Kodopi
Akhand Pratap Singh
Shri Rawatpura Sarkar University Raipur Chhattisgarh
Article Status
Available Documents
Abstract
Keywords: Hydroelectric Projects, Risk Assessment, Risk Management, Risk Potential Value, Risk Mitigation, Construction Management, Project Performance, Sustainable Development.
How to Cite this Paper
Kodopi, B. K. (2026). Identification, Assessment and Management of Critical Risks in Hydroelectric Projects. International Journal of Creative and Open Research in Engineering and Management, <i>02</i>(6). https://doi.org/10.55041/ijcope.v2i6.217
Kodopi, Birendra. "Identification, Assessment and Management of Critical Risks in Hydroelectric Projects." International Journal of Creative and Open Research in Engineering and Management, vol. 02, no. 6, 2026, pp. . doi:https://doi.org/10.55041/ijcope.v2i6.217.
Kodopi, Birendra. "Identification, Assessment and Management of Critical Risks in Hydroelectric Projects." International Journal of Creative and Open Research in Engineering and Management 02, no. 6 (2026). https://doi.org/https://doi.org/10.55041/ijcope.v2i6.217.
References
- Al-Bahar, J. F. and Crandall, K. C. (1990). “Systematic risk management approach for construction projects.” Journal of Construction Engineering and Management, ASCE, 533-546.
- Kangari, R. (1995). “Risk management perceptions and trends of U.S. Construction.” Journal of Construction Engineering and Management, ASCE, 422-429.
- Akintoye, A. S. and MacLeod, M. J. (1997). “Risk analysis and management in construction.” International Journal of Project Management, Vol. 15, 31-38.
- Hillson, D. A. (1997). “Towards a risk maturity model.” The International Journal of Project & Business Risk Management, Vol. 1, 35-45.
- Minato, T. and Ashley, D. B. (1998). “Data-driven analysis of “Corporate Risk” using historical cost-control data.” Journal of Construction Engineering and Management, ASCE, 42-47.
- Mak, S. and Picken, D. (2000). “Using risk analysis to determine construction project contingencies.” Journal of Construction Engineering and Management, ASCE, 130-136.
- Barber, R. B. (2005). “Understanding internally generated risks in projects.” International Journal of Project Management, 584-590.
- Imbeah, W. and Guikema, S. (2009). “Managing construction projects using the advanced programmatic risk analysis and management model.” Journal of Construction Engineering and Management, ASCE, 772-781.
- Zou, P. X. W., Chen, Y. and Chan, T. (2010). “Understanding and improving your risk management capability: assessment model for construction organizations.” Journal of Construction Engineering and Management, ASCE, 854-863.
- Kucukali, S. (2011). “risk assessment of river type hydropower plants by using fuzzy logic approach.” World Renewable Energy Congress- Sweden, 8-13.
Ethical Compliance & Review Process
- •All submissions are screened under plagiarism detection.
- •Review follows editorial policy.
- •Authors retain copyright.
- •Peer Review Type: Double-Blind Peer Review
- •Published on: Jun 17 2026
This article is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License. You are free to share and adapt this work for non-commercial purposes with proper attribution.

